The project involves the construction of 21 low-rise residential buildings (Capria West: 12 buildings and Capria East: 9 buildings) developed over a common basement and ground floor (B+G), with a total project duration of 28 months for Capria West and 27 months for Capria East, followed by a 2-month handover period.